Inspection IDReason for InspectionInspection DateInspection Status 
SIN-00290920 Renewal 06/09/2026 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.67(b)On 6/10/26 at 11:33 am one of the two car integral garages was discovered with a great deal of disorganized construction materials. The materials included power tools, electrical wire, metal and polyvinyl chloride pipe, (PVC), ladders, cement mixer, boxes and a great deal of other equipment. The disorganized construction material located in the integral garage is a hazardous environment posing a risk to all who enter. Floors, walls, ceilings and other surfaces shall be free of hazards.Effective 8/16/2026 UPMC WBH at Mon Yough has ended their lease agreement with the plumbing company which was the owner of the construction materials noted. All materials will be removed from the site as of 8/16/2026 to ensure compliance with the 6400.67 (b) regulatory requirements. 07/14/2026 Implemented
6400.80(b)On 06/10/26 at 11:35 AM outside the basement door, to the left, there was approximately a 4 foot-by-7-foot dirt area with a large hole measuring approximately one and a half foot long by one foot wide. Exiting the cemented area to the dirt was uneven with the cement. There was a cement stone, plastic bag, plastic bucket and other debris on the uneven surface. There was another hole located straight ahead of the basement door measuring approximately one foot by one foot. These demonstrate that the grounds are not well maintained, are in a state of disrepair, and are unsafe conditions. The outside of the building and the yard or grounds shall be well maintained, in good repair and free from unsafe conditions.Photos of the cleaned up loose dirt were submitted to the licenser on the day of the walkthrough by compliance. Furthermore, UPMC WBH At Mon Yough has submitted a proposal to fiscal to have the driveway hole(s) as well as uneven surface assessed by maintenance and repaired in alignment with 6400.80 (b) regulatory requirements. 07/14/2026 Implemented
SIN-00070858 Renewal 02/05/2015 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.68(b)The hot water temperature measured at the tub in the big bathroom measured 124.8 degrees Fahrenheit. Hot water temperatures in bathtubs and showers may not exceed 120°F. New more accurate digital themometers were purchased for all sites. We will continue recording water teperatures on a monthly basis on our Fire Drill Log and Supervisors will also do randomw water temp. checks monthly. 03/08/2015 Implemented
SIN-00257459 Renewal 12/17/2024 Compliant - Finalized
SIN-00218534 Renewal 01/31/2023 Compliant - Finalized
SIN-00185345 Renewal 03/25/2021 Compliant - Finalized
SIN-00130307 Renewal 02/27/2018 Compliant - Finalized
SIN-00110157 Renewal 03/08/2017 Compliant - Finalized