| 6400.67(b) | On 6/10/26 at 11:33 am one of the two car integral garages was discovered with a great deal of disorganized construction materials. The materials included power tools, electrical wire, metal and polyvinyl chloride pipe, (PVC), ladders, cement mixer, boxes and a great deal of other equipment. The disorganized construction material located in the integral garage is a hazardous environment posing a risk to all who enter. | Floors, walls, ceilings and other surfaces shall be free of hazards. | Effective 8/16/2026 UPMC WBH at Mon Yough has ended their lease agreement with the plumbing company which was the owner of the construction materials noted. All materials will be removed from the site as of 8/16/2026 to ensure compliance with the 6400.67 (b) regulatory requirements. |
07/14/2026
| Implemented |
| 6400.80(b) | On 06/10/26 at 11:35 AM outside the basement door, to the left, there was approximately a 4 foot-by-7-foot dirt area with a large hole measuring approximately one and a half foot long by one foot wide. Exiting the cemented area to the dirt was uneven with the cement. There was a cement stone, plastic bag, plastic bucket and other debris on the uneven surface. There was another hole located straight ahead of the basement door measuring approximately one foot by one foot. These demonstrate that the grounds are not well maintained, are in a state of disrepair, and are unsafe conditions. | The outside of the building and the yard or grounds shall be well maintained, in good repair and free from unsafe conditions. | Photos of the cleaned up loose dirt were submitted to the licenser on the day of the walkthrough by compliance. Furthermore, UPMC WBH At Mon Yough has submitted a proposal to fiscal to have the driveway hole(s) as well as uneven surface assessed by maintenance and repaired in alignment with 6400.80 (b) regulatory requirements. |
07/14/2026
| Implemented |