Inspection IDReason for InspectionInspection DateInspection Status 
SIN-00293836 Renewal 08/14/2026 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.67(a)The second floor bathroom shower had a knob that spun loosely and prevented the water from flowing and the water temperature from being checked.Floors, walls, ceilings and other surfaces shall be in good repair. Knob has been replaced. 08/28/2026 Implemented
6400.67(b)A junction box on the basement ceiling was uncovered exposing electrical wiring. A fallen wire was wrapped around the HVAC condenser in the yard of the residence. Floors, walls, ceilings and other surfaces shall be free of hazards.Junction box has been covered and wires placed appropriately and safely. (see shared folder) 08/20/2026 Implemented
6400.71The emergency contacts listed hospitals that were closed.Telephone numbers of the nearest hospital, police department, fire department, ambulance and poison control center shall be on or by each telephone in the home with an outside line. New updated emergency contact list showing currently opened hospital have been placed in the house. see shared folder 08/14/2026 Implemented
6400.74Anti-skid material was missing from the basement steps.Interior stairs and outside steps shall have a nonskid surface. Interior and exterior stairs fitted with anti-skid carpets. (see shared folder) 08/21/2026 Implemented
6400.82(f)The basement bathroom was missing toilet paper and paper towels.Each bathroom and toilet area that is used shall have a sink, wall mirror, soap, toilet paper, individual clean paper or cloth towels and trash receptacle. Toilet paper and paper towel fitted in the basement bathroom.(see shared folder) 08/14/2026 Implemented
6400.110(e)The interconnected fire alarms did not sound together when activated.If the home serves four or more individuals or if the home has three or more stories including the basement and attic, there shall be at least one smoke detector on each floor interconnected and audible throughout the home or an automatic fire alarm system that is audible throughout the home. The requirement for homes with three or more stories does not apply to homes licensed in accordance with this chapter prior to November 8, 1991. interconnected smoke detector has been installed (see shared folder) 08/21/2026 Implemented
6400.112(d)4 of the 12 fire drills in the past year exceeded the two minute-thirty second requirement and did not have additional drills recorded in the month to achieve the required evacuation time. Drills recorded: 08/04/2026 -- 2 minutes 64 seconds 04/12/2026 -- 2 minutes 48 seconds 03/06/2026 -- 1 minute 98 seconds 12/12/2025 -- 2 minutes 38 seconds Individuals shall be able to evacuate the entire building, or to a fire safe area designated in writing within the past year by a fire safety expert, within 2 1/2 minutes or within the period of time specified in writing within the past year by a fire safety expert. The fire safety expert may not be an employe of the home or agency. Staff assistance shall be provided to an individual only if staff persons are always present at the home while the individual is at the home. Staff have been retrained on how to carry out a proper fire drill and the time expected. A new fire drill was done to identify training instructions were effective. (see shared folder) 08/24/2026 Implemented
SIN-00273490 Renewal 08/20/2025 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.21(a)No criminal history background check was done for staff member 1.An application for a Pennsylvania criminal history record check shall be submitted to the State Police for prospective employes of the home who will have direct contact with individuals, including part-time and temporary staff persons who will have direct contact with individuals, within 5 working days after the person's date of hire. Criminal check for Staff member 1 has been done. See documentation attached. 08/21/2025 Implemented
6400.67(a)The cabinet in the kitchen under the sink was loose. The dryer vent was not hooked up to the dryer.Floors, walls, ceilings and other surfaces shall be in good repair. The kitchen cabinet with loose hinges have been fixed. The dryer has been hooked up to the vent and has been used by staff. See documentation attached. 08/25/2025 Implemented
6400.67(b)There was paint peeling from the ceiling over the stove. The bathroom in the basement has a broken sink and seems to be under construction. Floors, walls, ceilings and other surfaces shall be free of hazards.1. Ceiling over kitchen stove in 321 has been replastered and re-painted 2. Basement toilet construction has been completed and the area deemed safe for use. See documentation attached. 08/26/2025 Implemented
6400.106No furnace inspection available at time of inspection.Furnaces shall be inspected and cleaned at least annually by a professional furnace cleaning company. Written documentation of the inspection and cleaning shall be kept. Furnace has been inspected, cleaned and certified in good working condition for use by Shillady plumbing LLC on 08/26/2025. See documentation attached. 08/26/2025 Implemented
6400.18(i)Incident ID # 9643168 has a discovery date of 06/21/25 and the incident was open past 30 days with no extension requested. Incident ID # 9632323 has a discovery date of 06/02/25 and an extension was not requested until 08/01/25. Incident ID #9639171 has a discovery date of 06/14/25 and an extension was not requested until 08/13/25.The home shall finalize the incident report through the Department's information management system or on a form specified by the Department within 30 days of discovery of the incident by a staff person unless the home notifies the Department in writing that an extension is necessary and the reason for the extension.Incident report has been completed and submitted in the EIM at on our end awaiting initiation review. 10/09/2025 Implemented
6400.51(a)(3)The 0rientation Training for staff member 1 was not completed within 30 days after hire.Prior to working alone with individuals, and within 30 days after hire, the following shall complete the orientation as described in subsection (b): Direct service workers, including full-time and part-time staff persons.Staff 1 was given 30days to complete all orientation training in line with 6100.143 but has still not complete the training. staff is currently off schedule from 0ctober 2nd 2025 and give till October 24, 2025, to complete all mandatory trainings. 10/24/2025 Implemented
SIN-00250551 Renewal 08/29/2024 Compliant - Finalized