| 2380.69(e) | The bathroom on the upper floor of the building lacked a wall mirror at the time of inspection. | Each bathroom shall have a wall mirror, soap, toilet paper, covered trash receptacle and individual clean paper towels or air hand dryer. | A wall mirror has been installed in the bathroom on the upper floor of the building. |
05/20/2025
| Implemented |
| 2380.70(b) | At the time of inspection, the program's first aid area lacked a bed or cot, a blanket, and a pillow. | The first aid area shall have a bed or cot, a blanket, a pillow and a first aid kit. | A cot, blanket and pillow has been placed in the first aid area. |
05/20/2025
| Implemented |